Description Of Item | Contains the following plans: No. 8 first floor plan (proposed works), November 1988 No. 8 ground floor plan (proposed works), August 1991 Ground floor plan (key plan), 1988 First floor plan (key plan), March 1990 Ground floor plan (services layout), March 1990 First floor plan (services layout), April 1990 Reception (proposed works), March 1990 Orde room (proposed works), March 1990 Committee Room or College Members Office, March 1990 Entrance Hall (proposed works), March 1990 Proposed College Officers Room (proposed works), October 1989 Fellows Room (proposed works), March 1990 Members Room (proposed works), March 1990 Reading Room (proposed works), March 1990 Kitchen (proposed works), March 1990 Fellows Suite Ante Room (proposed works), March 1990 Stairhall Plan (proposed works), March 1990 Stairhall elevation (proposed works), March 1990 Back stair and link corridor (proposed works), March 1990 Back stair and link landing - stone details, March 1990 Details of new window sashes Kitchen details (March 1990) Ironmongery schedule - sheet no. 1 - doors (March 1990) Ironmongery schedule - sheet no. 2 - windows and sundry (March 1990) Entrance hall vestibule - plan (August 1990) Entrance hall vestibule - elevation and section (August 1990) Entrance hall vestibule - full size detail, August 1990 Details of jib door D17 and 18, August 1990 Principal staircase - bottom step repaid, August 1990 Entrance hall - stone flag layout, September 1990 Kitchen details (September 1990) Main stair hall - baluster and hand rail finish, December 1990 No. 8 ground floor showers Achitrave details, type A, B, C, D, E, October 1989 Skirting details, type A, B, C, D, E, F, G, H, J, October 1989 Dado rail details, type A, B, C, D, October 1989 Dado rail details, type E, May 1990 Door type A, B, C, D, E, F (September 1989, October 1989, August 1990) Overdoor piece details, September 1989 Door ingo panel details, October 1989 Entrance door fanlight, August 1990 Main stair - repairs to Balustrade and handrail, November 1989 Back stair - new handrail and balustrade, November 1989 Reading room chimney piece, July 1990 Reception room chimney piece, July 1990 Entrance hall chimney piece, June 1990 Ord room chimney piece, August 1990 Cupola fixing - main stair, June 1990 Male WCs (toilets) - new WCs, February 1991 Handrail profile, January 1991 Members / fellows room mirror, March 1991 Fellows room table Original adam ceiling drawing - Sibbald Room, Cullen Suite, Fellows Room, Orde Room Basement floor plan (proposed works), September 1995 Second floor plan (proposed works), September 1995 Roof plan (proposed works), September 1995 Front elevation (proposed works), September 1995 Rear elevation (proposed works), September 1995 Basement link details, August 1995 Boiler room new window details, August 1995 Details of new window sashes, August 1995 Dormer window details, July 1995 Door and window ironmongery schedule, September 1995 Front east basement area (proposed works), May 1995 Front west basement area (proposed works), September 1995 Rear basement area (proposed works), May 1995 Chimney no C1, C2, C3 details (May 1995 Dormer window details, July 1995 Chimney copes, July 1996 Basement stair, July 1996 Basement electrics and wall finishes, July 1996 Details of wood-cored roll and drip joint in lead, July 1995 Details of lead covered torus roll at flat roof edge, July 1995 Detail of lead ridge flashing, July 1995 Detail of lead hip flashing, July 1995 Detail of lead pitched valley, July 1995 Detail of lead watergate with cover flashing, July 1995 Detail of lead cover flashing and raggle fixing, July 1995 Detail of lead cornice weathering with cover flashing, July 1995 Detail of ventilated ridge, July 1995 Cellar window details, July 1995 Cellar doors, July 1995 Skirting details, July 1995 Stop details, July 1995 Architrave detail, July 1995 and August 1995 Cornice profiles, July 1995 Door - six panel door details, July 1995 Door - half hour fire resistant door detail, July 1995 Door, August 1995 and September 1995 |